GK Marine

Engineering Service & Machinery Manufacturing

About GK Marine

Business Category

Engineering Service & Machinery Manufacturing

Business Scope

Manpower supply & Client care service

Pre-Commissioning & Commissioning

Repair Service

Installation & Modification

Fabrication

Company History

2007~2015

Establishment of MTC International
Samsung Heavy Industries:
  • Registered as a partner company of Samsung Heavy Industries
  • 2007.03 Piping design contract
  • 2007.04 PM subcontract
  • 2008.08 Ship equipment design contract
  • 2009.10 Commissioning contract(BP SKARV)
  • 2010.04 Commissioning contract(Gazflot I,II)
  • 2010.09 Commissioning contract(Drillships)
  • 2012.11 Ship electrical design contract
  • 2013.07 MC service contract
  • 2014.01 Nigeria Corporation Establishment
  • 2015.01 Nigeria Egina Project Manpower supply contract
  • 2015.07 WALK DOWN manpower supply contract
Halliburton International:
  • 2010.01 Local Vendor registration in Korea & Total Service Agreement
  • 2012.01 Modification contract (DSME yard)
NOV:
  • 2013.05 Local Vendor registration in Korea
  • 2014.07 Installation BOP Pipe Line & Blower Motor Modification
IMS:
  • 2013.11 Service Providing contract
Daewoo Shipbuilding & Marine Engineering:
  • 2014.03 Electrical and piping design personnel supply
Aker Solution:
  • 2014.12 Paint Repair work contract (in China)
Maersk:
  • 2015.04 Inspector manpower deployed contract
STX:
  • 2015.07 Commissioning contract

2016~2021

Establishment of a corporate research center(2016.01)
Establishment MTC Tech Coperation(2016.03)
Designated as a venture company of Korea SMEs and Startups Agency(2016.07)
Signed an innovative company technology development agreement for Bilge Water Treatment System 5ppm level(2016.11)
Patent and design application for pipe protection film construction method(2019.09)
Samsung Heavy Industries:
  • 2016.02 W/D work contract (SHELL FLNG FPSO)
  • 2016.06 Shell Appomattox safety manager work entrusted
  • 2016.07 Egina FPSO test operation PTW task entrusted
  • 2017.10 Contract of PTW (ICLD towing) for EGINA FPSO
  • 2018.12 Petronas FLNG Piping Insulation work consignment
  • 2019.01 OCR#9,10 Maintenance and Preservation work consignment
  • 2019.05 ENI Coral FLNG predecessor vessel design W/F work entrusted
Doosan Engine:
  • 2016.04 Engine parts dealership contract
Samsung Renault Motors :
  • 2017.05 Signing of standard contract
HIDRAMAR GROUP :
  • 2017.05 Signing of Master Service Agreement
JGC CORPORATION :
  • 2017.05 Signing of Service Agreement
  • 2017.05 Contract of GTG/GTC stack duct repair work for PFLNG2 Project
BHI :
  • 2018.02 Gwangyang Power Plant Unit 6 Revenge Improved tube life No consignment
  • 2018.04 Pohang Steel Mill 3rd and 4th sintering Cooling facility heat recovery Expanded construction work entrusted
Chord X :
  • 2019.12 Ship smartization installer up-contract
  • 2021 Local Vendor registration in Korea
  • 2021 Installation of wireless network equipment on board
Samsung Electronics
  • 2021 Pyeongtaek Semiconductor Extension P3 Indoor/Outdoor Air Conditioning Piping Work

2022~

Re-starting a business as GK Marine(2022.12)

Projects

Buisness Scope and Projects

INSTALLATION & MODIFICATION

▶Installation of various structures and units
▶Disassembling of existing units
▶Assembly, Installation, Overhaul, Repair

Main Project

  • Prelude FLNG
  • SONGA #1~4
  • SEADRILL #7~9

Scope

▷ Installation and Modification of On-Deck
engine generator
Ballast Water Treatment System
Billage Water Treatment System
incinerator
heat exchanger

▷ Engine generator(On-Deck)
installation
overhaul
repair

▷ Intermediate Storage, test
▷ electrical and instrumental work

Pre-COMMISSIONING & COMMISSIONING

▶Engage skilled commissioning professionals
▶Provide the best service to complete on time within a fixed budget

Main Project

  • Cat-J #1~2
  • Valemon Platform.
  • Drillships

Scope

▷ Setting of Comm’g procedure
▷ Develpoment of project plan
▷ Commanding Pre-Comm'g/Comm'g (Mech., E&I)
▷ Establish quality inspection and procurement procedures

REPAIR SERVICE

▶Paint repair
▶Modification and production of various small structures and units
▶welding and grinding

Main Project

  • ZLNG
  • ASTA HANSEN
  • ROWAN #1
  • OFON PJT

Scope

▷ Grinding on welding area
▷ First Paint touch up
▷ proceeding PTW
▷ proceeding Tool Box Talk
▷ Cat walk welding

FABRICATION

▶Accurate and efficient production services through 3D modeling and budgeting

Main Project

  • SHELL FLNG

Scope

▷ Fabrication of steel structure for shipbuilding & offshore project
Crane (LLC, overhead, etc) Steel bridge / Sluice Gate
piperack
Steel Jetty

▷ Fabrication of steel structure for shipbuilding & offshore project
tank (Ball, storage)
pressure vessel
chemical PKG
pipe line
Steel Jacket/platform

MANPOWER SUPPLY & CLIENT CARE SERVICE

▶Supply of various ENGINEERS and TECHNICIANS such as Design, Commissioning and welding
▶Securing a pool of excellent domestic and foreign human resources
▶Client TOTAL CARE SERVICE including accommodation, shuttle and office setting

Main Project

  • SHELL FLNG
  • EGINA FPSO.
  • MARTIN RINGE

Scope

▷ HR pool mangement
▷ Finding overseas personnel and processing of self-recruiting
▷ accommodation setting
▷ shuttle and car rent
▷ office setting

Units

Unit List

  • All
  • OIL FLUSHING
  • CHEMICAL
  • WATER JET FLUSHING
  • HIGH PRESSURE WASHER
  • UNDERWATER PUMP
  • AIR DIAHUREM PUMP

DM-OIL-01

2,148 L/min (537 L/min*4ea)

DM-OIL-02

3,600 L/min

DM-OIL-03

537 L/min

DM-OIL-04

1,074 L/min

DM-OIL-05

225 L/min

DM-OIL-06

375 L/min

DM-CHE-01

500 L/min

DM-CHE-02

333 L/min

DM-CHE-03

833 L/min

DM-CHE-04

378 L/min

DM-CHE-05

500 L/min

DM-CHE-06

225 L/min

DM-CHE-07

500 L/min

DM-W/J-01

221 L/min

DM-H/P-01

15 L/min

DM-H/P-02

15 L/min

DM-UW/P-01

150 L/min

DM-UW/P-02

150 L/min

DM-A/D-01

117 L/min

DM-A/D-02

57 L/min

DM-A/D-03

57 L/min

Contact

Contact Us

Address

3rd, Geojejungang-ro 1812, Geoje-si, Gyeongnam, S.Korea

Call Us

055-634-2284

Email Us

anfernee422@gkmarine.co.kr